Tunbridge Wells Hospital

Job Specification

Complete 5 Area Hospital Refurbishment

Name of Project

Tunbridge Wells Hospital

Description of Works

GP Rooms
  • Strip out of existing partition walls, suspended ceilings, vinyl floor coverings, IPS units and existing mechanical and electrical services
  • Infill existing window between rooms and 1no internal door aperture
  • Installation of new metal stud partition wall incorporating new door set
  • Installation of new suspended ceilings (plasterboard perimeter and laying grid systems)
  • Installation of new internal door sets (2no in total)
  • Re-fix existing IPS unit and sanitary ware
  • New vinyl floor coverings
  • Decoration works
  • New window film to GP room and corridor
  • New Electrical installation
  • New Mechanical and ventilation installation
  • Separate existing ceiling chilled beam unit
FSU Area
  • Strip out of existing partition walls, suspended ceilings, 2no sets of double doors, vinyl floor coverings and existing mechanical and electrical services
  • Installation of new metal stud partition walls to perimeter walls
  • Installation of new suspended ceilings
  • Installation of new bumper rails
  • New vinyl floor coverings
  • Decoration works to main area and 1no WC
  • Installation of new desks from David Bailey furniture
  • New Electrical installation
  • New Mechanical and adaptions to ventilation system
  • Adaptions to fire alarm installation
  • Adaptions to nurse call installation
A&E Reception Area
  • The new SAU WC has been formed from the conversion of a bed space and is part of imaging (IMA)
  • Installation of new metal stud partition wall
  • Infill existing walls up to soffit level
  • Installation of new suspended ceiling
  • Installation of new bi-folding internal door set
  • New IPS units and sanitary ware
  • New vinyl floor covering
  • Decoration works
  • New Electrical installation
  • New Mechanical and ventilation installation
CDU Area
  • The new CDU has been formed from the conversion of the A&E Majors (ECC)
  • Strip out of existing partition walls, suspended ceilings, vinyl floor coverings, internal door sets, IPS units and existing mechanical and electrical services
  • Installation of new metal stud partition walls
  • Installation of new suspended ceilings (plasterboard and laying grid systems)
  • Installation of new internal door sets
  • Installation of Altro Whiterock wall cladding
  • New vinyl floor coverings
  • Decoration works
  • New Electrical installation
  • New Mechanical and ventilation installation
  • New Fire alarm installation
  • New Comms & data installation
  • Nurse call installation
Surgical Assessment Unit
  • The new SAU WC has been formed from the conversion of a bed space and is part of imaging (IMA)
  • Installation of new metal stud partition wall
  • Infill existing walls up to soffit level
  • Installation of new suspended ceiling
  • Installation of new bi-folding internal door set
  • New IPS units and sanitaryware
  • New vinyl floor covering
  • Decoration works
  • New Electrical installation
  • New Mechanical and ventilation installation